精品区卡一卡2卡三免费-精品破处-精品欧美一区二区在线观看欧美熟-精品欧美一区二区三区在线观看-亚洲视频一区在线播放-亚洲视频一区网站

Products

Contact Us

Hubei Rigel Industrial Co.,Ltd
Add: Dushan Road, EZhou Economic Development Zone, Hubei, China
Tel: +86-711-5907446Tel: +86-711-5907446
candyluo: +86-13720214854
E-mail: rigelcandy@163.com
Url: https://www.rigelpanel.en.alibaba.com/
WeChat : candyluo8888 or 0086 13720214854

Installation Process

Home > Products > Installation Process
  • Setting the line and carrying the board in positionEject double lines of board thickness up and down the axes of installed wall board, easily carry the panel to the side of wall according to the required specification.
  • Sawing boardUsing hand-hold electric saw to saw freely according to the specification of wall.
  • SizingSpread polymer mortar on one tenon side casually.
  • InstallationCarrying the panel to the installation place, correcting the wall board by gavelock and making it tightly close, and let the polymer mortar squeeze out into full and fixing it with a chock temporarily.
  • Correcting、FixingUsing a guiding rule of two meters or longer to check verticality and leveling correction, then using 6mm or 8mm reinforcing steel bar and using the construction sealant to fix.
  • Grouting and filling starchFilling and strickling the corrected wall panel with polymer mortar, filling the big gap with pea gravel concrete.
  • Stick anticrack tapeClean dirt of each cement gap and stick anticrack tape.
  • Installing electrical wires and switchesSetting lines on the places needing to be set with concealed wire and switch box, then cut a groove by hand-hold electric saw,filling with polymer mortar after installation。
  • Installing doorcasePreparing a door and window hole on the installed wall, anchoring by the splint or lines.
  • Facing coating and wall papersScraping putty powder directly without plastering on the installed wall,then brushing coating and sticking wall paper.
  • Facing cermic tile,decorative sheetSticking ceramic tiles or other wood facing panels casually without plastering on installed wall.
  • Eelectric apparatus installationInstall lights,furniture,air-conditioners casually on installed room, nailed or hanged.

Hot News

主站蜘蛛池模板: 日韩免费不卡| 日本在线观看一区| 久久久久久久国产免费看| 免费大香伊蕉在人线国产| 91蜜桃传媒一二三区| 91日韩精品天海翼在线观看| 91精品国产免费久久久久久| 97色伦图片97综合影院| 欧美老妞bbwhd| 福利视频免费观看| 欧美tube8在线观看| 日韩精品123| 高腐短篇男男各种play| 69日本人护士xx| 99国产精品2018视频全部| 9797色| 最新chinese old man| 91蜜芽尤物福利在线观看| 超级乱淫护士| 亚洲综合色播| 奇米影视9999| 亚洲综合区小说区激情区噜噜| 人人干天天操| 欧美日韩精品一区三区| 999re6热在线精品视频思思| 2020国产麻豆剧传媒| 欧美亚洲国产第一页草草| 2021国产麻豆剧传媒官网| 男人在线播放永久| 美女脱内衣18下看禁止免费| 91久久国产综合精品女同我| 毛片网站在线播放| 日韩高清在线二区| freehd另类xxxx| adc欧美成人影院| 大陆性初航k8在线观看| 迈开腿往里面种草莓软件| 日本大片aa特黄| 吃老师的扇贝视频| 欧美高清videossexo黑吊| 日韩a一级欧美一级在线播放|